Set the farm with piles, dig all the connections, connect everything to the grid. Three machines build a farm, and we find all three.
Tell us the site, we source the machine
Pile drivers for driving posts: Gayk, Orteco, Pauselli, Vermeer, Mazaka, Hydra. Specialized machines, fast, GPS guided. Up to 6m max height.
Trenchers dig with an hourly productivity an excavator cannot come close to. At the required depth and width, on any soil.
With HDD rigs you take the cable all the way to the substation, passing under roads, canals and railways with no open-cut trenches.
We come from the jobsite, not from a desk: fifteen years, six spoken languages, machines from all over the world, never advertised online, and technical inspection before you sign.
Give us the hectares or MW, ground type, construction start date and budget. A member of our team will reply within 2 business days.
Trenchers for the cable runs and HDD rigs for the grid connection. We source both used, from all over the world.
Hourly output. On a solar farm you are digging kilometres of trench at a set depth and width, and a trencher does that far faster than an excavator, on any soil.
With an HDD rig. It drills a guided bore under the obstacle and pulls the cable through, so the surface stays intact all the way to the substation.
Trenchers and HDD are among the most sought-after machines in markets where solar is expanding fast. We sell them for you: no upfront costs, you set the price.